You are here: Original Structure > Getting Started > MiiNT 2.5 Administration Interface > Navigation > Report Pages > Scheduled

Scheduled

This page type is used to display a graphical breakdown of a selected report query represented as an interactive time line.

Note: Report queries used for a schedule have specific output requirements. Please refer to the Schedule topic under MiiNT Administration for information on these requirements.

In the example report above the equipment states for all equipment for the 02/10/2012 are displayed in a schedule by equipment. A miniature version of the schedule is displayed in the time line bar for the period 01/10/2012 to 02/10/2012, from where the schedule selector can be moved to select another range and change the time line intervals from day to hours or 15 minute intervals.

Note: Schedule pages can be set to refresh the data automatically at set intervals.

Refer to the Schedule topic under the Navigation Menu Page Types folder for information on creating Schedule pages.